Freeport Minerals Corporation

United States of America

Back to Profile

1-20 of 20 for Freeport Minerals Corporation Sort by
Query
Patent
World - WIPO
Excluding Subsidiaries
Aggregations Reset Report
Date
2024 January 11
2024 (YTD) 11
2023 2
2022 2
Before 2019 5
IPC Class
C22B 15/00 - Obtaining copper 11
G06Q 50/02 - Agriculture; Fishing; Mining 10
G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" 9
C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching 6
C22B 3/06 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions 5
See more
Found results for  patents

1.

SYSTEM AND METHOD FOR DETERMINING A DUMP LOCATION FOR A VEHICLE

      
Application Number US2023069046
Publication Number 2024/006683
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Gaddie, Travis
  • Geislinger, Dana
  • Tinsley, Margaret Alden
  • Issoe, Luciano Kiniti
  • Ni, Tianfang
  • Alam, Muneeb
  • Gerdes, Luke
  • Klesov, Oleksandr
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Demieville, Cory A.
  • Freeman, Robyn

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 10/0631 - Resource planning, allocation, distributing or scheduling for enterprises or organisations
  • G06Q 50/02 - Agriculture; Fishing; Mining
  • C22B 15/00 - Obtaining copper
  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

2.

SYSTEM AND METHOD FOR DETERMINING LIFT HEIGHTS OF A STOCKPILE

      
Application Number US2023069047
Publication Number 2024/006684
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Geislinger, Dana
  • Tinsley, Margaret Alden
  • Sanyal, Akaash
  • Freeman, Robyn
  • Gaddie, Travis
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Crossman, Raquel
  • Ni, Tianfang
  • Demieville, Cory A.
  • Gerdes, Luke
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G01C 5/00 - Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
  • C22B 3/06 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions

3.

SYSTEM AND METHOD FOR DETERMINING CHANGES TO A HEAT PROFILE OF A STOCKPILE

      
Application Number US2023026228
Publication Number 2024/006208
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Richardson, Steven Chad
  • Freeman, Robyn
  • Gerdes, Luke
  • Tinsley, Margaret Alden
  • Geislinger, Dana
  • Sanyal, Akaash
  • Gaddie, Travis
  • Alam, Muneeb
  • Crossman, Raquel
  • Ni, Tianfang
  • Demieville, Cory A.
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching
  • C22B 11/00 - Obtaining noble metals
  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G06Q 10/063 - Operations research, analysis or management

4.

SYSTEM AND METHOD FOR DETERMINING A LOCATION OF ORE IN A STOCKPILE

      
Application Number US2023026235
Publication Number 2024/006214
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Demieville, Cory A.
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Ni, Tianfang
  • Gerdes, Luke
  • Freeman, Robyn
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G01N 33/24 - Earth materials
  • G06Q 10/0631 - Resource planning, allocation, distributing or scheduling for enterprises or organisations

5.

SYSTEM AND METHOD FOR ADJUSTING LEACHING OPERATIONS BASED ON LEACH ANALYTIC DATA

      
Application Number US2023026242
Publication Number 2024/006215
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Issoe, Luciano Kiniti
  • Ni, Tianfang
  • Klesov, Oleksandr
  • Gerdes, Luke
  • Crossman, Raquel
  • Alam, Muneeb
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Demieville, Cory A.
  • Freeman, Robyn

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching
  • C22B 11/00 - Obtaining noble metals
  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G06Q 10/063 - Operations research, analysis or management

6.

SYSTEM AND METHOD FOR ADJUSTING LEACHING OPERATIONS BASED ON LEACH ANALYTIC DATA

      
Application Number US2023069051
Publication Number 2024/006686
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Ni, Tianfang
  • Demieville, Cory A.
  • Gerdes, Luke
  • Freeman, Robyn
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • G06Q 10/0631 - Resource planning, allocation, distributing or scheduling for enterprises or organisations
  • C22B 15/00 - Obtaining copper
  • C22B 3/06 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions
  • C22B 3/08 - Sulfuric acid

7.

SYSTEM AND METHOD FOR ADJUSTING LEACHING OPERATIONS BASED ON LEACH ANALYTIC DATA

      
Application Number US2023069052
Publication Number 2024/006687
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Ni, Tianfang
  • Demieville, Cory A.
  • Gerdes, Luke
  • Freeman, Robyn
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • G06Q 10/0631 - Resource planning, allocation, distributing or scheduling for enterprises or organisations
  • C22B 15/00 - Obtaining copper
  • C22B 3/06 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions
  • C22B 3/08 - Sulfuric acid

8.

SYSTEM AND METHOD FOR ACTIVATING DEEP RAFFINATE INJECTION BASED ON LEACH ANALYTIC DATA

      
Application Number US2023069055
Publication Number 2024/006689
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Ni, Tianfang
  • Demieville, Cory A.
  • Gerdes, Luke
  • Freeman, Robyn
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • G06Q 10/0631 - Resource planning, allocation, distributing or scheduling for enterprises or organisations
  • C22B 15/00 - Obtaining copper
  • C22B 3/06 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions
  • C22B 3/08 - Sulfuric acid

9.

SYSTEM AND METHOD FOR ADJUSTING LEACHING OPERATIONS BASED ON LEACH ANALYTIC DATA

      
Application Number US2023026217
Publication Number 2024/006200
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Ni, Tianfang
  • Demieville, Cory A.
  • Gerdes, Luke
  • Freeman, Robyn
  • Klesov, Oleksandr
  • Issoe, Luciano Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • G06Q 10/06 - Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
  • G06Q 50/02 - Agriculture; Fishing; Mining

10.

SYSTEM AND METHOD FOR ASSIGNING A HAUL TRUCK DUMP TO A LOCATION

      
Application Number US2023026246
Publication Number 2024/006217
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Issoe, Luciano Kiniti
  • Ni, Tianfang
  • Gerdes, Luke
  • Geislinger, Dana
  • Gaddie, Travis
  • Tinsley, Margaret Alden
  • Alam, Muneeb
  • Richardson, Steven Chad
  • Sanyal, Akaash
  • Crossman, Raquel
  • Demieville, Cory A.
  • Freeman, Robyn
  • Klesov, Oleksandr

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • G06Q 10/06 - Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
  • C22B 15/00 - Obtaining copper
  • C22B 3/06 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions
  • G06Q 50/02 - Agriculture; Fishing; Mining

11.

SYSTEM AND METHOD FOR DETERMINING ESTIMATED REMAINING MINERAL IN A STOCKPILE

      
Application Number US2023026249
Publication Number 2024/006219
Status In Force
Filing Date 2023-06-26
Publication Date 2024-01-04
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Klesov, Oleksandr
  • Gerdes, Luke
  • Geislinger, Dana
  • Tinsley, Margaret, Alden
  • Freeman, Robyn
  • Sanyal, Akaash
  • Alam, Muneeb
  • Crossman, Raquel
  • Gaddie, Travis
  • Richardson, Steven, Chad
  • Ni, Tianfang
  • Demieville, Cory, A.
  • Issoe, Luciano, Kiniti

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

IPC Classes  ?

  • G06Q 10/04 - Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
  • C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching
  • C22B 11/00 - Obtaining noble metals
  • G06Q 50/02 - Agriculture; Fishing; Mining
  • G06Q 10/063 - Operations research, analysis or management

12.

ACID MIST SUPPRESSION IN COPPER ELECTROWINNING

      
Application Number US2022046030
Publication Number 2023/059872
Status In Force
Filing Date 2022-10-07
Publication Date 2023-04-13
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Sandoval, Scot Philip
  • Tallman, Stanberg Lee
  • Sanders, William Duane
  • Gebrehiwot, Ephrem Lemlem
  • Tyab, Aron

Abstract

A method of acid mist suppression in copper electrowinning is described. In various embodiments, at least one liquid licorice root extract, powdered licorice root extract, or reconstituted licorice extract is added in an amount sufficient to the acidic electrolyte solution of the copper electrowinning process to suppress acid mist from the acidic electrolyte solution during the copper electrowinning process. In various embodiments, combinations of licorice extract and surfactant show synergies in acid mist suppression during copper electrowinning.

IPC Classes  ?

  • C25C 1/12 - Electrolytic production, recovery or refining of metals by electrolysis of solutions of copper
  • C25D 3/38 - Electroplating; Baths therefor from solutions of copper
  • C25D 21/04 - Removal of gases or vapours

13.

METHODS AND SYSTEMS FOR LEACHING A METAL-BEARING MATERIAL

      
Application Number US2022043625
Publication Number 2023/043898
Status In Force
Filing Date 2022-09-15
Publication Date 2023-03-23
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor Lyons, Sarah

Abstract

Methods for recovering a metal value from a metal-bearing material are provided. The method comprises agglomerating the metal-bearing material with an agglomeration solution comprising a raffinate, an oxidant, and citric acid or salts thereof to form an agglomerated metal-bearing material; leaching the agglomerated metal-bearing material with a leaching solution comprising the raffinate and the citric acid or salts thereof to produce a pregnant leaching solution and a leached material; re-oxidizing the leached material with a curing solution comprising the raffinate and the oxidant; and recovering the metal value from the pregnant leach solution to produce the raffinate.

IPC Classes  ?

  • C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching
  • C22B 15/00 - Obtaining copper
  • C22B 3/08 - Sulfuric acid
  • C22B 3/16 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in organic solutions

14.

METHOD FOR RECOVERING COPPER, MOLYBDENUM, AND PRECIOUS METALS FROM SILICATE-CONTAINING ORE

      
Application Number US2021053958
Publication Number 2022/081411
Status In Force
Filing Date 2021-10-07
Publication Date 2022-04-21
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Mota, Brenda Lizzet
  • Bolles, Thomas R.
  • Green, Christine Rae
  • Gunturi, Santosh Srivatsa
  • Villalba, Jr., Manuel G.

Abstract

The present disclosure provides a method of recovering copper, molybdenum, and a precious metal value from a metal-bearing material, the method comprising bulk flotation of the metal-bearing material to form a flotation product, wherein the metal-bearing material comprises a copper compound, a molybdenum compound, at least one precious metal value, and a silicate, pressure oxidizing the flotation product to form a pressure oxidized discharge, separating the pressure oxidized discharge to form a separated liquid and separated solid, extracting molybdenum, via a molybdenum solution extraction, from the separated liquid to form a molybdenum-containing stream and a copper-containing stream, extracting copper, via a copper solution extraction, from the copper-containing stream, and extracting the precious metal value, via a cyanide leaching process, from the separated solid.

IPC Classes  ?

15.

METHOD FOR RECOVERING COPPER, MOLYBDENUM, AND PRECIOUS METALS FROM MINERAL ORES VIA PRESSURE OXIDATION

      
Application Number US2021053961
Publication Number 2022/081413
Status In Force
Filing Date 2021-10-07
Publication Date 2022-04-21
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Green, Christine Rae
  • Mota, Brenda Lizzet
  • Gunturi, Santosh Srivatsa
  • Villalba, Manuel G., Jr.

Abstract

The present disclosure provides a method of recovering copper, molybdenum, and a precious metal value from a metal-bearing material, the method comprising bulk flotation of the metal-bearing material to form a flotation product, wherein the metal-bearing material comprises a copper compound, a molybdenum compound, and at least one precious metal value, pressure oxidizing the flotation product to form a pressure oxidized discharge, separating the pressure oxidized discharge to form a separated liquid and separated solid, extracting molybdenum, via a molybdenum solution extraction, from the separated liquid to form a molybdenum-containing stream and a copper-containing stream, extracting copper, via a copper solution extraction, from the copper-containing stream, and extracting the precious metal value, via a cyanide leaching process, from the separated solid.

IPC Classes  ?

16.

SYSTEMS AND METHODS FOR MONITORING METAL RECOVERY SYSTEMS

      
Application Number US2015050015
Publication Number 2016/108959
Status In Force
Filing Date 2015-09-14
Publication Date 2016-07-07
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Dean, Jr., John Warren
  • Wooten, Christopher
  • Zenner, Chase

Abstract

Various embodiments provide a leaching solution monitoring module comprising a first leaching solution distribution system interface, a flow meter in fluid communication with the first leaching solution distribution system interface, the flow meter in fluid communication a 3-way pressure regulator, and a second leaching solution distribution system interface in fluid communication with the 3-way pressure regulator.

IPC Classes  ?

  • C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching

17.

SYSTEMS AND METHODS FOR IMPROVED METAL RECOVERY USING AMMONIA LEACHING

      
Application Number US2014020511
Publication Number 2014/158844
Status In Force
Filing Date 2014-03-05
Publication Date 2014-10-02
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Robertson, Joanna M.
  • Bolles, Thomas R.
  • Gertenbach, Dennis D.

Abstract

Systems and methods for basic leaching are provided. In various embodiments, a method is provided comprising leaching a slurry comprising a copper bearing material and a leach medium comprising ammonia and ammonium carbonate, adding copper powder to the slurry, separating the slurry into a pregnant leach solution and solids, and performing a solvent extraction on the pregnant leach solution to produce an loaded aqueous stream.

IPC Classes  ?

  • C22B 15/00 - Obtaining copper
  • C22B 3/02 - Apparatus therefor
  • C22B 3/12 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic alkaline solutions
  • C22B 3/26 - Treatment or purification of solutions, e.g. obtained by leaching by liquid-liquid extraction using organic compounds

18.

SYSTEMS AND METHODS FOR IMPROVED METAL RECOVERY USING AMMONIA LEACHING

      
Application Number US2014020508
Publication Number 2014/158842
Status In Force
Filing Date 2014-03-05
Publication Date 2014-10-02
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Robertson, Joanna M.
  • Bolles, Thomas R.
  • Gertenbach, Dennis D.

Abstract

Systems and methods for basic leaching are provided. In various embodiments, a method is provided comprising leaching a slurry comprising a copper bearing material and an ammonia leach medium, adding copper powder to the slurry, separating the slurry into a pregnant leach solution and solids, and performing a solvent extraction on the pregnant leach solution to produce an loaded aqueous stream.

IPC Classes  ?

  • C22B 3/14 - Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic alkaline solutions containing ammonia or ammonium salts
  • C22B 3/02 - Apparatus therefor
  • C22B 15/00 - Obtaining copper
  • C22B 3/26 - Treatment or purification of solutions, e.g. obtained by leaching by liquid-liquid extraction using organic compounds

19.

SYSTEM AND METHOD FOR RECOVERY OF METAL VALUES FROM METAL-BEARING MATERIALS THROUGH LEACHING

      
Application Number US2014024040
Publication Number 2014/150710
Status In Force
Filing Date 2014-03-12
Publication Date 2014-09-25
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Raman, Anand
  • Goel, Nitin

Abstract

Metal value recovery processes for the recovery of multiple metal values from metal-bearing materials are provided. Processes and methods provided may include the use of multiple leach stages, as well as multiple solvent extraction stages. Raffinates from the solvent extraction stages can be combined to improve metal value recovery.

IPC Classes  ?

  • C22B 3/04 - Extraction of metal compounds from ores or concentrates by wet processes by leaching
  • C22B 3/26 - Treatment or purification of solutions, e.g. obtained by leaching by liquid-liquid extraction using organic compounds

20.

METHODS AND SYSTEMS FOR LEACHING A METAL-BEARING ORE

      
Application Number US2013058188
Publication Number 2014/042948
Status In Force
Filing Date 2013-09-05
Publication Date 2014-03-20
Owner FREEPORT MINERALS CORPORATION (USA)
Inventor
  • Robertson, Joanna M.
  • Green, Christine Rae
  • Bowman, Gabriel Elias

Abstract

A system and method for recovering a metal value from a metal-bearing ore material are provided. A metal-bearing ore can be mixed with certain substances and to form an agglomerated ore. In an intermediate state, between agglomeration and heap formation, bacteria can be added to the metal-bearing ore material to produce an augmented ore. The augmented ore can then be formed into a heap. Bacteria from the heap may be fortified to assist in bacterial growth.

IPC Classes  ?

  • C22B 3/18 - Extraction of metal compounds from ores or concentrates by wet processes with the aid of microorganisms or enzymes, e.g. bacteria or algae
  • C22B 15/00 - Obtaining copper